CtrlS Mumbai DC 3 is listed at 10 MW of power capacity across 1,045 racks and 146,000 square feet — 9.6 kW a rack and 68 watts a square foot. That last figure is the lowest of any card on the campus, which makes this the roomiest building in the estate by floor area per megawatt. It is also the only card in the campus set with no date attached to it and no published basis for whether 10 MW is IT load or gross power.
1At a glance
2Ten megawatts on 146,000 square feet
Square footage is the input nobody argues about, which makes it the best available test of whether a card is describing a dense building or a large one.
| Card | Power | Floor area | W per sq ft | Sq ft per rack |
|---|---|---|---|---|
| DC 5 | 32 MW | 228,482 | 140 | 83 |
| DC 4 | 36.8 MW | 265,000 | 139 | 90 |
| DC 1 and DC 2 | 40 MW | 394,177 | 101 | 71 |
| DC 3 | 10 MW | 146,000 | 68 | 140 |
Sixty-eight watts a square foot is a 2008-era ratio, and 140 square feet per cabinet is a floorplate that was laid out for a different decade. The two newer buildings in the same estate run at more than twice that power intensity.
What this means commercially is straightforward. DC 3 is the cheapest space in the campus to rent per square foot and the most expensive per kilowatt, because a low-density hall charges for the cabinet, the cross-connect and the cage before it charges for the power. That is a real product — it just is not the product most of the market is buying in 2026.
Square feet per rack. It tells you instantly whether a hall was designed for 1,000 cabinets or 700, and it is the figure operators rarely print.
On this campus it ranges from 71 to 140 — a factor of two, in one estate, from one company.
3The five cards compared
| Card | Power | Racks | kW a rack | W per sq ft |
|---|---|---|---|---|
| DC 1 and DC 2 | 40 MW | 5,555 | 7.2 | 101 |
| DC 3 | 10 MW | 1,045 | 9.6 | 68 |
| DC 4 | 36.8 MW | 2,936 | 12.5 | 139 |
| DC 5 | 32 MW | 2,750 | 11.6 | 140 |
| Total of the cards | 118.8 MW | 12,286 | 9.7 | 115 |
An oddity worth one sentence. This card lists 1,045 racks. The operator’s Kolkata building, 1,900 kilometres away and four years newer, lists 1,044 on its corporate page. A single rack is coincidence, not evidence of anything — but in a registry built from operator cards, near-identical figures across unrelated sites are worth noticing rather than smoothing.
The campus total of 118.8 MW across 12,286 racks is the number every other CtrlS Mumbai page depends on. It is 2.8 MW more than the 116 MW a trade report attributed to the same five buildings in July 2026, which is a 2.4% difference and not worth chasing — until someone is valuing the business at ₹121 crore per megawatt, at which point 2.8 MW is ₹340 crore.
4Timeline
- The first two campus buildings enter service
- DC 3, DC 4 and DC 5 are added as the campus builds toward its first substation limit
- Grid capacity at the campus substation doubles to 300 MW, with headroom to 700 MW
- The operator publishes DC 3 at 10 MW, 1,045 racks and 146,000 square feet, with no date
- No commissioning date, IT-load basis or occupancy for this building in the public record
5Limits and open questions
6Sources
Sources: CtrlS Mumbai data centre page, CtrlS corporate site, CtrlS datacenters page, Data Center Dynamics on the campus build, Baxtel Navi Mumbai listings, datacenterlocations, dcmarketinsights.