Power & Approvals Research — evidence, sources and limits

Project headlines may publish capacity without specifying a site’s sanctioned load, substation headroom or connection schedule. Gridvik organizes public evidence where available; estimates are source-dated and are not utility confirmations. The 242-record Registry remains free to browse.

✓ Analyst-led research where scoped · file/email delivery as agreed · dashboard/API coming soon, not hosted · changes are dated after verification
power-layer-hero.png
POWER REALITY · PILOT

The 4 fields — what they mean in a Monday meeting

Announcements show reported intent and capacity; this research organizes available evidence about power and approvals. Neither is a utility confirmation.

🔌
Sanctioned Load

A public filing may state sanctioned load or a connection. Cite the scope, unit and date; do not infer it from a campus headline.

A campus or phase MW figure is not a substation sanction.
🚦
Headroom

Use reported, estimated or unknown labels only where evidence supports them. “OK” and any time range are not utility confirmations.

Illustrative labels only · no live utility feed
🏛️
Grant & Disbursal

Separate a policy announcement or approval from documented payment; a Government Order alone does not establish disbursement.

Policy approval ≠ verified disbursement.
⏳
Time-to-Power (TTP)

A Gridvik estimate may be made only where dated public milestones support it; it is not a utility schedule or promised energisation date.

Not estimated without dated milestones; no utility schedule implied.

Where we look — public sources; no utility access or permit confirmation

DISCOM/CTUIL

ARR, tariff orders, GNA registers, SLDC, POSOCO

Policy portals

KIADB/RIICO/MIDC G.O.s, single-window, CEIG/EC

Press + benchmarks

Operator newsrooms, ET, Savills/C&W (aggregates only)

Source links, dates and confidence are stated on the relevant Registry pages where available. Missing fields remain unknown; we do not warrant error-free data. Disclaimer →

Source-linked examples — no inferred utility values

Registry recordPublished capacity / basisUtility evidenceTTP
Google AI Hub · Vizag (PRJ-001)1,000 MW announced hub total; basis unstated; no campus split.The public record does not establish a site-specific sanctioned load or headroom.Not estimated; no utility schedule implied.
STT GDC Siruseri campus (PRJ-019)45 MW campus total; Phase 1 is 7.2 MW within the parent (PRJ-143), not additive.Campus capacity is not substation headroom; no utility confirmation is inferred.Not estimated; no utility schedule implied.
Sify Chennai 02 · Siruseri (PRJ-028)130+ MW eventual IT design; current operating load is not confirmed.Dedicated 230 kV substation reported; sanctioned MW is not stated.Not estimated; no utility schedule implied.

These examples link to public Registry pages. No headroom or TTP value is inferred here; check each source date and capacity basis. All 242 records are free to browse. Free 8-row preview →

Pilot — what you actually get today

Dashboard/API is in development, not yet hosted. Pilot is analyst-led:

  • Source-linked power/approval fields where available, delivered by file/email under the selected paid plan
  • Any analyst walkthrough is specified in the written order
  • Dated changes; paid phase alerts are sent manually by email after verification where included in the selected plan
See current plans and request forms →